SellUp · prepared 3 September 2026
Everything we have prepared for SellUp
Five documents, three separate estimates, one measured scan behind all of it. Start with the proposal; the rest is there so every number in it can be checked.
Start here
The proposal — nine parts, plain language, no jargon in the body. It is the document written to be read by someone who does not work in search.
The work itself
48–79 hours on mkt.sellup.com.sg — of which 34–55 h we can commit to today and 14–24 h depends on one access decision.
Two more, kept apart
A portal SEO module at 57–97 h, and a search growth programme offered as four separately-agreeable estimates (24–40 · 52–92 · 37–63 · 11–18 h). Both are separate agreements. None of these three totals is ever added to another.
Why you can check it
Twelve claims were measured against your live site, and a full crawl of 451 URLs sits behind them. Where the crawl disagreed with us, we changed our own finding rather than the page.
Payment
A deposit on every milestone — not once per engagement. Each milestone is invoiced in two equal halves: 50% on kick-off and 50% on sign-off. The engagement has four milestones and the portal module three, each invoiced the same way. Percentages are of that milestone's own agreed value.
Documents5
Engagement48–79 h
Portal module57–97 h
Growth · 4 estimates124–213 h
Measured claims12
URLs crawled451
Mockup screens12
Findings withdrawn1
How the five documents relate
2 audiences · 1 evidence base · 2 separate agreements
The proposal and the delivery view carry identical numbers — only the language differs, so a non-technical reader and a developer can be given the same estimate without either being handed the wrong document. The two dashed items are agreed separately and are never added into the 48–79 h.
What each document is
In the order we would send them. Every band traces back to a work item, and every work item to a clause in your brief.
5 documents
Send these two
Same numbers, two languages
019 partsView detail
0211 partsView detail
Proposal — for the person making the decision
Nine parts. No jargon in the body; the technical detail is demoted into visibly-secondary "for your developer" asides rather than deleted. Carries the three options, twelve checks you can run yourself, eight things we are not doing, and the one outcome nobody can honestly promise.
Delivery view — for your developer or CTO to audit
Eleven parts. The same twelve work items split by discipline, the dependency register, the milestone roll-up, and the factors that would move the number — each marked according to whether we measured it or are assuming it. Offer this for technical review before signing, not after.
The evidence behind both
read it if a number looks wrong
Separate agreements — outside the engagement total
Never added in
0457–97 hView detail
054 estimatesView detail
Portal SEO module — twelve mockup screens
A product design for an SEO module inside your own portal, so your team manages titles, descriptions, canonicals and schema without a developer. The SEO analysis dashboard, seven content-type list screens and three detail screens. The design already exists — the 57–97 h estimate was sized against these screens, which is why each of its eight items names the screens it came from.
Growth programme — research, content, off-page, measurement
Six parts, and four separate estimates — research (24–40 h), content (52–92 h), off-page (37–63 h) and measurement (11–18 h) — each sized, footed and agreed on its own, exactly as the portal module is. None of it is in your brief — that is an engineering spec for one property, this is research, content and earned media. Five of its fourteen items are priced per unit, so you set the volumes and the total follows arithmetically. Includes a 58-point ecommerce SEO checklist with the seventeen items our scans already verified as done, and the evidence for each.
How the work would run — kick-off to handover
4 stages · 4 slots · 48–79 h
Four stages, and every one answers the same four questions: what SellUp gives, what we do, what must pass before the stage is left, and what you get to keep. Nothing touches your live site until stage 1’s gate has re-confirmed the estimate — the highlighted cell. The two DEAL cells need access we do not yet have; decline both and the engagement is 34–55 h, not 48–79 h. Both the proposal and the delivery view carry these four stages in more detail.
And one page that is not a document
the only page carrying money